Contractors.es icon

Contractors.es

Interact with Contractors.es API

Actions995

Project Proposal Scope Of Work Relation Api → Patch Api Contractors Project Proposals Project Proposal Scopes Of Work Scopes Of Work

AI-generated

Summary

Update metadata fields of a specific scope of work related to a project proposal within the Contractors.es system by sending a PATCH request with selected fields to modify.

Inputs

  • Project Proposal (required) — Numeric ID of the project proposal to which the scope of work belongs.
  • Scopes Of Work (required) — Numeric ID of the specific scope of work record to update.
  • Project Proposal Id — String to update the project proposal ID field; leave as default 'DO_NOT_UPDATE' to keep unchanged.
  • Project Stage Id — String to update the project stage ID field; leave as default 'DO_NOT_UPDATE' to keep unchanged.
  • Scope Of Work Id — String to update the scope of work ID field; leave as default 'DO_NOT_UPDATE' to keep unchanged.
  • Calculate By — String to update the calculation method; leave as default 'DO_NOT_UPDATE' to keep unchanged.
  • Hour Rate — String representing the hourly rate; leave as default 'DO_NOT_UPDATE' to keep unchanged.
  • Hour Rate Currency — String for the currency code of the hourly rate; leave as default 'DO_NOT_UPDATE' to keep unchanged.
  • Unit — String describing the unit measure; leave as default 'DO_NOT_UPDATE' to keep unchanged.
  • Quantity — String for the quantity amount; leave as default 'DO_NOT_UPDATE' to keep unchanged.
  • Unit Rate — String representing the unit rate; leave as default 'DO_NOT_UPDATE' to keep unchanged.
  • Unit Rate Currency — String for the currency code of the unit rate; leave as default 'DO_NOT_UPDATE' to keep unchanged.
  • Est Hours Per Unit — String estimating hours per unit; leave as default 'DO_NOT_UPDATE' to keep unchanged.
  • Est Mandays — String estimating mandays; leave as default 'DO_NOT_UPDATE' to keep unchanged.
  • Est Labor — String estimating labor cost; leave as default 'DO_NOT_UPDATE' to keep unchanged.
  • Est Labor Currency — String for labor cost currency code; leave as default 'DO_NOT_UPDATE' to keep unchanged.
  • Material — String describing material cost; leave as default 'DO_NOT_UPDATE' to keep unchanged.
  • Est Material Per Unit — String estimating material cost per unit; leave as default 'DO_NOT_UPDATE' to keep unchanged.
  • Est Material Per Unit Currency — String for estimated material per unit currency code; leave as default 'DO_NOT_UPDATE' to keep unchanged.
  • Est Material — String estimating total material cost; leave as default 'DO_NOT_UPDATE' to keep unchanged.
  • Est Material Currency — String for estimated material total currency code; leave as default 'DO_NOT_UPDATE' to keep unchanged.
  • Equipment — String describing equipment cost; leave as default 'DO_NOT_UPDATE' to keep unchanged.
  • Est Equipment Per Unit — String estimating equipment cost per unit; leave as default 'DO_NOT_UPDATE' to keep unchanged.
  • Est Equipment Per Unit Currency — String for estimated equipment per unit currency code; leave as default 'DO_NOT_UPDATE' to keep unchanged.
  • Est Equipment — String estimating total equipment cost; leave as default 'DO_NOT_UPDATE' to keep unchanged.
  • Est Equipment Currency — String for estimated equipment total currency code; leave as default 'DO_NOT_UPDATE' to keep unchanged.
  • Description — String to update the description of the scope of work; leave as default 'DO_NOT_UPDATE' to keep unchanged.

Output shape

a single updated scope of work record as returned by the API

This operation sends a PATCH request updating only the specified fields provided (fields set to 'DO_NOT_UPDATE' are omitted from the update). The response contains the updated resource. Handles request options like batching, proxies, timeout, and SSL via node settings.

Links

Discussion