Actions8
Set Grid Import/Export
AI-generatedSummary
Updates a Teslemetry energy site’s grid import and export settings. Choose the site, export rule, and whether to disallow grid charging when solar is installed.
Inputs
- Site ID (required) — Energy site to update.
- Export Rule — Preferred export behavior: Battery OK (default), PV Only, or Never.
- Disallow Charge From Grid — Whether to disallow charging from the grid when solar is installed; defaults to false.
Output shape
A single API response object confirming the grid import/export settings update.
The node passes the selected export rule and boolean setting to Teslemetry’s grid import/export endpoint.