Zen ERP icon

Zen ERP

Zen ERP connector node

Actions1246

Supply/Production → ProductionStepOpFinish

AI-generated

Summary

Finish a production step in the supply production workflow by specifying its numeric ID.

Inputs

  • id (required) — The numeric ID of the production step operation to finish.

Output shape

a single JSON object representing the finished production step operation or an error object

Outputs either the resulting finished production step operation data or an error structure if the operation fails. Errors include message, description, and optionally stacktrace details.

Examples

Example 1: Finish a production step with ID 123

Set 'id' parameter to 123 to mark that production step operation as finished in Zen ERP.

Discussion